Service

Special Foundation Engineering

Shoring, bored pile walls and underpinning for demanding deep construction projects in Berlin.

Scope

What's included

01

Excavation shoring and sheet piling

02

Bored pile walls and micropiles

03

Underpinning according to DIN 4123

04

Soldier pile walls

05

Groundwater lowering and dewatering

06

Securing adjacent buildings

Details

Special Foundation Engineering in Berlin and Brandenburg

Lula Bau GmbH offers professional special foundation engineering services in Berlin and Brandenburg. From excavation shoring to bored pile walls to underpinning existing buildings, we cover all deep construction requirements. Our experience with Berlin's subsoil, particularly the typical sand and boulder clay layers, enables safe and efficient execution.

At a Glance

DIN 4123 certified
Berlin subsoil expertise
Tight urban locations
Monitoring and documentation
Demolition Association Member · Fixed Prices · Free Consultation

Special foundation engineering begins where ordinary earthworks end: when loads have to

reach deeper strata, when a neighbouring building is founded higher than your excavation

base, or when groundwater is in the way.

Signs that you need it

The planned excavation base lies deeper than the neighbouring foundation
The ground will not carry the loads, for example peat or soft cohesive layers
Groundwater stands above the excavation base
Settlement-sensitive buildings or services adjoin the site

Underpinning

The most common trigger in Berlin, particularly for underground car parks next to period

buildings on strip footings. Work proceeds in short, non-adjacent sections, each one

exposed and immediately rebuilt, so the building is never left unsupported along its

length. The cost is normally borne by the client of the new building, not by the owner

whose building is underpinned, and a condition survey is mandatory before work starts.

Bored piles, micro piles and pile walls

ArrangementPilesPropertyTypical use
spacedwith gaps, infilled betweenload-bearing, not tightstable soil above groundwater
tangenttouchingload-bearing, nearly tighthigh loads, little water
secantinterlockingwatertightexcavation in groundwater

Micro piles suit confined conditions: small diameter, small rig, usable inside basements.

Berlin-type shoring: driven or drilled

Driven or vibratedSet into bored holes
Speedfastslower
Costlowerhigher
Vibrationnoticeablepractically none
Suitable next torobust structuresperiod buildings, sensitive equipment

Groundwater

Either the water is lowered, which needs a water permit and can cause settlement nearby,

or the excavation is sealed with secant piles or sheet piling, which costs more but is

predictable.

Condition surveys and monitoring

A surveyor documents the neighbouring buildings before work starts; settlement and wall

deflection are measured during execution. Without a baseline record, a later complaint

comes down to one word against another.

Together with excavation and demolition

Foundations, shoring and

earthworks interlock. If a building still stands on the plot,

demolition comes first.

Process

How Your Project Works

Step 1

Soil survey and planning

Step 2

Structural calculation

Step 3

Permits and coordination

Step 4

Shoring and securing

Step 5

Excavation and monitoring

Projects

712+

Berlin Districts

12

Years Experience

29+

Association-certified

100%

FAQ

Frequently Asked Questions

When is underpinning required?

Whenever the planned excavation base lies deeper than the neighbouring building's foundation, which would otherwise lose lateral support. In Berlin this is especially common for underground car parks next to period buildings on strip footings.

Who pays for underpinning a neighbouring building?

Normally the client of the new building, the party founding deeper. The neighbour must tolerate the work but does not bear the cost, and is entitled to continuous structural safety of their building.

What is the difference between a pile wall and a soldier pile wall?

A soldier pile wall uses steel beams with infill between them and is the more economical option, but it is not watertight. A bored pile wall consists of reinforced concrete piles, carries far higher loads and is watertight when the piles are secant.

Does the work cause vibration?

It depends on the installation method. Driven or vibrated profiles are fast and cheaper but noticeable. Setting beams into pre-bored holes, or using bored piles, produces practically no vibration, which is what we choose next to period buildings or sensitive equipment.

Do I need a ground investigation report?

For any special foundation project, yes. Without soil parameters and groundwater levels neither the structural design nor a sound choice of method is possible, and any cost estimate remains guesswork.

Service Areas

Special Foundation Engineering across Berlin

We operate in all Berlin districts and throughout Germany.

Your Project

Do you have a demolition project?

Contact us for a free consultation and a non-binding fixed-price quote. We will get back to you within 24 hours.

Free consultationFixed priceGermany-wide