Asbestos per TRGS 519

Asbestos disposal in Berlin

Asbestos roof, Eternit façade or old asbestos cladding? We safely dismantle asbestos-containing components in Berlin and dispose of them properly as hazardous waste – per TRGS 519, with protective measures and a complete disposal certificate. On request at a fixed price including removal.

What we remove and dispose of

Asbestos roof removal

Corrugated sheets, roof tiles and fibre cement dismantled and disposed of properly.

Asbestos cladding removal

Façade and wall panels (e.g. Eternit) removed and packaged with minimal dust.

Asbestos disposal

Safe packaging and transport to an approved hazardous-waste landfill.

Disposal certificate

Complete documentation – legally sound for authorities and your records.

How Asbestos Is Disposed of in Berlin

Asbestos-containing material must not go into construction rubble or to a recycling centre. It has to be dismantled without breakage, sealed in approved big bags, labelled and taken to a licensed landfill – every step under TRGS 519 and documented. Depending on the material this costs €25 to €200 per square metre including removal, packaging and landfill fees.

The sequence is the same on every project: sampling and laboratory analysis, notification to the occupational safety authority at least seven days in advance, containment and protective measures, breakage-free removal, approved packaging, transport to a licensed landfill, and finally the disposal records for your files.

Costs

MaterialStandardDifficult access
Corrugated sheets (roof)€20 – 35 per m²€35 – 55 per m²
Façade panels€25 – 45 per m²€40 – 65 per m²
Floor-Flex tiles€15 – 30 per m²€25 – 45 per m²
Asbestos tile adhesive€25 – 45 per m²€35 – 60 per m²
Lightweight boards (loosely bound)€50 – 100 per m²€60 – 120 per m²
Sprayed asbestos€80 – 200 per m²€100 – 230 per m²

Landfill fees add €150–250 per tonne for bonded asbestos cement and €250–500 per tonne for loosely bound material. See asbestos disposal costs.

Bonded or Loosely Bound

Bonded asbestos (asbestos cement, Eternit) contains 10–15 percent asbestos held in cement and releases few fibres while intact – which is why it is unscrewed rather than broken. Loosely bound asbestos (sprayed asbestos, lightweight boards, fire protection cladding) contains up to 60 percent asbestos and releases fibres on vibration alone, requiring a sealed negative-pressure zone, personnel airlock and clearance measurement afterwards.

Where It Is Found

Roof and façade sheets (1950–1990), Floor-Flex tiles and cushion vinyl (1960–1985), tile and floor adhesives, window putty, night storage heaters, fire protection cladding and sprayed asbestos on steel beams. Rule of thumb: for buildings from before 1993 – the year of the German asbestos ban – assume asbestos until proven otherwise.

Notification and Records

Asbestos work must be notified to the occupational safety authority at least seven days in advance and may only be carried out by firms with recognised competence under TRGS 519. You receive the disposal certificate, weighing slips and remediation documentation. For full remediation rather than disposal alone, see asbestos remediation.

Common questions about asbestos disposal

How is an asbestos roof disposed of?

Asbestos roof sheets are dismantled without breakage, packaged with minimal dust, labelled and taken to an approved landfill. All work follows TRGS 519 with protective measures. You receive a disposal certificate.

What does asbestos disposal cost in Berlin?

Costs depend on quantity, material and accessibility. After a free inspection we give you a binding fixed price including disposal and certificate – with no hidden costs.

May I take asbestos to the landfill myself?

For small quantities of bonded asbestos in owner-occupied homes it is in principle permitted, but we advise against it: approved packaging is not available at a DIY store, many acceptance points limit private deliveries, and breakage during removal contaminates the surface below. For loosely bound asbestos, commercial properties and rented housing, DIY is ruled out.

What is the difference between bonded and loosely bound asbestos?

Bonded asbestos such as Eternit contains 10–15 percent asbestos held in cement and releases few fibres while intact, which is why it is dismantled without breakage. Loosely bound material such as sprayed asbestos contains up to 60 percent and releases fibres on vibration alone, requiring a sealed negative-pressure zone and clearance measurement afterwards.

Does asbestos disposal have to be notified?

Yes. Asbestos work must be notified to the occupational safety authority at least seven days before it starts, in Berlin the LAGetSi. Only firms with officially recognised competence under TRGS 519 may carry it out. We file the notification for you.

How do I know whether my building contains asbestos?

For buildings from before 1993 – the year of the German asbestos ban – assume asbestos until proven otherwise. Typical locations are roof and façade sheets, Floor-Flex tiles, tile adhesive, window putty, night storage heaters and pipe insulation. Only a laboratory sample gives certainty, at €400 to €1,500.

Your Project

Do you have a demolition project?

Contact us for a free consultation and a non-binding fixed-price quote. We will get back to you within 24 hours.

Free consultationFixed priceGermany-wide