For Property Developers
You want no unpleasant surprises after demolition – just a site that's immediately ready for construction.
As a property developer, you're facing a critical phase: the existing structure must go so your new build can begin. But between demolition and the first excavation lie risks – hidden hazardous materials, unforeseen costs, poorly prepared sites. Our team of demolition experts and in-house structural engineers ensures every step is planned with your new build in mind.
In-House Engineers
Our structural engineers plan the demolition to ensure the site is optimally usable for your new build. Structural integrity, soil conditions, and utility connections are considered from the start – not when problems arise.
The Difference
Hidden costs through change orders
Binding fixed-price quote
Hazardous material surprises delay new build
Hazardous material survey before demolition
Coordinating multiple contractors
Everything from one source – one contact
Site not handed over build-ready
Engineer plans the handover with you
Process
Our Process for Developers
Joint site inspection and project analysis
Engineering planning with new build in mind
Hazardous material survey and permits
Professional demolition with documentation
Handover of a build-ready site
Benefits
Why Lula Bau?
In-House Engineers
Unlike pure demolition crews, we have in-house structural engineers who accompany your project technically. No external consultants needed – technical assessment, structural evaluation, and demolition planning come directly from our team.
Fixed-Price Quote – No Extras
We inspect on-site, calculate honestly, and give you a fixed price. It stands – even if we find surprises underground. In over 500 projects, we've never recalculated.
Full Service
Hazardous material surveys, permits, demolition, disposal, earthworks – you have one contact for everything. No back-and-forth between different companies.
Build-Site Optimized Handover
We think ahead to the new build: access roads for your construction firm, utility connections exposed, soil tested and prepared. You don't just get an empty site – you get a build-ready one.
FAQ
Frequently Asked Questions
How long does a typical demolition project take?
Duration depends on size and complexity. A single-family home takes 1-2 weeks, an industrial hall 4-8 weeks.
Is the fixed-price quote really binding?
Yes. Our fixed price stands – even if we encounter unforeseen issues during work.
What happens if hazardous materials are found?
We conduct a hazardous material survey before every demolition. Remediation is already part of our quote.
Can you also handle the excavation for the new build?
Yes, we offer earthworks as part of our service package – seamlessly after demolition.
Guides
Your Project
Do you have a demolition project?
Contact us for a free consultation and a non-binding fixed-price quote. We will get back to you within 24 hours.