For Developers

For Property Developers

You want no unpleasant surprises after demolition – just a site that's immediately ready for construction.

Request Consultation

As a property developer, you're facing a critical phase: the existing structure must go so your new build can begin. But between demolition and the first excavation lie risks – hidden hazardous materials, unforeseen costs, poorly prepared sites. Our team of demolition experts and in-house structural engineers ensures every step is planned with your new build in mind.

In-House Engineers

Our structural engineers plan the demolition to ensure the site is optimally usable for your new build. Structural integrity, soil conditions, and utility connections are considered from the start – not when problems arise.

The Difference

Hidden costs through change orders

Binding fixed-price quote

Hazardous material surprises delay new build

Hazardous material survey before demolition

Coordinating multiple contractors

Everything from one source – one contact

Site not handed over build-ready

Engineer plans the handover with you

Process

Our Process for Developers

01

Joint site inspection and project analysis

02

Engineering planning with new build in mind

03

Hazardous material survey and permits

04

Professional demolition with documentation

05

Handover of a build-ready site

Avg. 3 WeeksProject Duration
100%Fixed-Price Guarantee
< 24hQuote Turnaround
Since 1996Family Business

Benefits

Why Lula Bau?

In-House Engineers

Unlike pure demolition crews, we have in-house structural engineers who accompany your project technically. No external consultants needed – technical assessment, structural evaluation, and demolition planning come directly from our team.

Fixed-Price Quote – No Extras

We inspect on-site, calculate honestly, and give you a fixed price. It stands – even if we find surprises underground. In over 500 projects, we've never recalculated.

Full Service

Hazardous material surveys, permits, demolition, disposal, earthworks – you have one contact for everything. No back-and-forth between different companies.

Build-Site Optimized Handover

We think ahead to the new build: access roads for your construction firm, utility connections exposed, soil tested and prepared. You don't just get an empty site – you get a build-ready one.

FAQ

Frequently Asked Questions

How long does a typical demolition project take?

Duration depends on size and complexity. A single-family home takes 1-2 weeks, an industrial hall 4-8 weeks.

Is the fixed-price quote really binding?

Yes. Our fixed price stands – even if we encounter unforeseen issues during work.

What happens if hazardous materials are found?

We conduct a hazardous material survey before every demolition. Remediation is already part of our quote.

Can you also handle the excavation for the new build?

Yes, we offer earthworks as part of our service package – seamlessly after demolition.

Your Project

Do you have a demolition project?

Contact us for a free consultation and a non-binding fixed-price quote. We will get back to you within 24 hours.

Free consultationFixed priceGermany-wide