Shoring & Excavation Support

Safe excavation pits in Berlin – Berlin-type shoring, sheet piling and bored pile walls in accordance with DIN 4124.

Scope

What's included

01

Berlin-type shoring (soldier pile wall)

02

Sheet piling for pits in groundwater

03

Bored pile walls (spaced, contiguous, secant)

04

Bracing and ground anchoring

05

Slope stabilisation per DIN 4124

06

Underpinning of adjacent buildings

07

Dewatering and groundwater lowering

08

Structural coordination and monitoring

Details

Shoring & Excavation Support in Berlin and Brandenburg

Lula Bau GmbH plans and executes excavation support for construction projects in Berlin and Brandenburg. From a certain depth, shoring is required so that pits remain stable and neighbouring buildings are not endangered – DIN 4124 governs when and how. We select and execute the right method for every project.

At a Glance

Execution per DIN 4124
Berlin subsoil expertise
Own driving and drilling equipment
Tight urban sites
Demolition Association Member · Fixed Prices · Free Consultation

Process

How Your Project Works

Step 1

Evaluate soil survey

Step 2

Select method and structural calculation

Step 3

Permits and neighbour coordination

Step 4

Install shoring (driving/drilling)

Step 5

Layered excavation with monitoring

Projects

0+

Berlin Districts

0

Years Experience

0+

Association-certified

0%

FAQ

Frequently Asked Questions

When is shoring mandatory?

Under DIN 4124, vertical excavation walls must be shored from a depth of about 1.25 m unless a sufficiently flat slope is possible. With tight surroundings or groundwater, shoring is almost always required.

What does Berlin-type shoring cost?

Costs depend on the shoring wall area and typically range from 150 to 350 euros per square meter. Depth, soil conditions, bracing and anchoring affect the price. You receive a binding fixed-price quote after an inspection.

Which shoring method is right?

Above groundwater, Berlin-type shoring is usually the most economical solution. In groundwater or for very deep pits, sheet piling or bored pile walls are used. Next to existing buildings, low-vibration bored pile walls are advantageous.

What is the difference between Berlin-type and Essen-type shoring?

With Berlin-type shoring, vertical steel beams are set and lagged after excavation, which requires temporarily stable soil. With Essen-type shoring, horizontal lagging is installed layer by layer with the excavation, suitable for low-stability granular soils where a free-standing cut is not possible. We decide based on the soil survey.

Service Areas

Shoring & Excavation Support across Berlin

We operate in all Berlin districts and throughout Germany.

Your Project

Do you have a demolition project?

Contact us for a free consultation and a non-binding fixed-price quote. We will get back to you within 24 hours.

Free consultationFixed priceGermany-wide