Service
Shoring & Excavation Support
Safe excavation pits in Berlin – Berlin-type shoring, sheet piling and bored pile walls in accordance with DIN 4124.
Scope
What's included
Berlin-type shoring (soldier pile wall)
Sheet piling for pits in groundwater
Bored pile walls (spaced, contiguous, secant)
Bracing and ground anchoring
Slope stabilisation per DIN 4124
Underpinning of adjacent buildings
Dewatering and groundwater lowering
Structural coordination and monitoring
Details
Shoring & Excavation Support in Berlin and Brandenburg
Lula Bau GmbH plans and executes excavation support for construction projects in Berlin and Brandenburg. From a certain depth, shoring is required so that pits remain stable and neighbouring buildings are not endangered – DIN 4124 governs when and how. We select and execute the right method for every project.
At a Glance
Process
How Your Project Works
Evaluate soil survey
Select method and structural calculation
Permits and neighbour coordination
Install shoring (driving/drilling)
Layered excavation with monitoring
Evaluate soil survey
Select method and structural calculation
Permits and neighbour coordination
Install shoring (driving/drilling)
Layered excavation with monitoring
Projects
0+
Berlin Districts
0
Years Experience
0+
Association-certified
0%
FAQ
Frequently Asked Questions
When is shoring mandatory?
Under DIN 4124, vertical excavation walls must be shored from a depth of about 1.25 m unless a sufficiently flat slope is possible. With tight surroundings or groundwater, shoring is almost always required.
What does Berlin-type shoring cost?
Costs depend on the shoring wall area and typically range from 150 to 350 euros per square meter. Depth, soil conditions, bracing and anchoring affect the price. You receive a binding fixed-price quote after an inspection.
Which shoring method is right?
Above groundwater, Berlin-type shoring is usually the most economical solution. In groundwater or for very deep pits, sheet piling or bored pile walls are used. Next to existing buildings, low-vibration bored pile walls are advantageous.
What is the difference between Berlin-type and Essen-type shoring?
With Berlin-type shoring, vertical steel beams are set and lagged after excavation, which requires temporarily stable soil. With Essen-type shoring, horizontal lagging is installed layer by layer with the excavation, suitable for low-stability granular soils where a free-standing cut is not possible. We decide based on the soil survey.
Guides
Service Areas
Shoring & Excavation Support across Berlin
We operate in all Berlin districts and throughout Germany.
Your Project
Do you have a demolition project?
Contact us for a free consultation and a non-binding fixed-price quote. We will get back to you within 24 hours.