Service

Shoring & Excavation Support

Safe excavation pits in Berlin: Berlin-type shoring, sheet piling and bored pile walls in accordance with DIN 4124.

Scope

What's included

01

Berlin-type shoring (soldier pile wall)

02

Sheet piling for pits in groundwater

03

Bored pile walls (spaced, contiguous, secant)

04

Bracing and ground anchoring

05

Slope stabilisation per DIN 4124

06

Underpinning of adjacent buildings

07

Dewatering and groundwater lowering

08

Structural coordination and monitoring

Details

Shoring & Excavation Support in Berlin and Brandenburg

Lula Bau GmbH plans and executes excavation support for construction projects in Berlin and Brandenburg. From a certain depth, shoring is required so that pits remain stable and neighbouring buildings are not endangered. DIN 4124 governs when and how. We select and execute the right method for every project.

At a Glance

Execution per DIN 4124
Berlin subsoil expertise
Own driving and drilling equipment
Tight urban sites
Demolition Association Member · Fixed Prices · Free Consultation

From a vertical wall height of about 1.25 metres DIN 4124 requires the excavation to

be secured. Whether that becomes a slope or a shoring system depends on available space,

soil and neighbouring buildings rather than on price.

Slope or shore

SlopeShoring
Space requiredhigh, grows with depthminimal, vertical wall
Costlowhigher, but space-saving
Limitslope angle per DIN 4124, depending on soil typeto be proven structurally
Typicalopen site, surrounding regioninner city, adjacent buildings

The permissible slope angle follows DIN 4124 by soil type. The value for your site comes

from the ground investigation report.

Which shoring method fits

ConstraintMethodWhy
Soil above groundwater, confined siteBerlin-type shoringmost economical, beams reusable
Excavation base in groundwatersheet pilinginterlocking profiles, watertight
Directly against existing buildingsbored pile walldrilled rather than driven, no vibration
Loose, unstable soilEssen-type shoringsecured layer by layer
Very deep excavationbored pile wall with anchorstakes high earth pressure

Where neighbouring buildings adjoin

1.Condition survey. A surveyor documents the state of the neighbouring buildings before work starts.
2.Check the foundations. If they reach deeper than your excavation base, underpinning is required; we carry that out as special foundation engineering.
3.Permission for anchors. Grouted anchors often reach under the neighbouring plot, which needs an agreement with its owner.

Bracing or anchoring

BracingGrouted anchors
Principlestruts across the excavationtendons into the ground behind the wall
Excavationobstructedstays clear
Neighbouring plotnot affectedusually affected

Berlin ground conditions

Berlin sits largely on sand, which is not cohesive, and the groundwater table is high in

places. That is why watertight shoring is more common here than elsewhere and why

dewatering is a cost block of its own. Lowering groundwater requires a water permit.

Together with excavation and demolition

Shoring and earthworks interlock: digging proceeds layer by layer

while the infill wall grows with it. If a building still stands on the site, we also

handle demolition.

Process

How Your Project Works

Step 1

Evaluate soil survey

Step 2

Select method and structural calculation

Step 3

Permits and neighbour coordination

Step 4

Install shoring (driving/drilling)

Step 5

Layered excavation with monitoring

Projects

712+

Berlin Districts

12

Years Experience

29+

Association-certified

100%

FAQ

Frequently Asked Questions

When is shoring mandatory?

Under DIN 4124, vertical excavation walls must be shored from a depth of about 1.25 m unless a sufficiently flat slope is possible. With tight surroundings or groundwater, shoring is almost always required.

Is the shoring removed after construction?

Usually yes. Once the structure is complete the boards and beams are pulled and reused where undamaged, which noticeably reduces the cost. If the shoring stays in the ground, for instance because pulling it would cause settlement next door, it is called lost shoring, which is more expensive and should be settled before work begins.

Which shoring method is right?

Above groundwater, Berlin-type shoring is usually the most economical solution. In groundwater or for very deep pits, sheet piling or bored pile walls are used. Next to existing buildings, low-vibration bored pile walls are advantageous.

What is the difference between Berlin-type and Essen-type shoring?

With Berlin-type shoring, vertical steel beams are set and lagged after excavation, which requires temporarily stable soil. With Essen-type shoring, horizontal lagging is installed layer by layer with the excavation, suitable for low-stability granular soils where a free-standing cut is not possible. We decide based on the soil survey.

Service Areas

Shoring & Excavation Support across Berlin

We operate in all Berlin districts and throughout Germany.

Your Project

Do you have a demolition project?

Contact us for a free consultation and a non-binding fixed-price quote. We will get back to you within 24 hours.

Free consultationFixed priceGermany-wide