Old Building Gutting Lichtenberg
Complete gutting of a Gründerzeit-era building with 12 residential units in preparation for core renovation.

Challenge
The 1905 old building contained multiple hazardous material layers from various renovation periods. Elaborate stucco ceilings on the ground floor were to be preserved.
Solution
Layer-by-layer hazardous material analysis and remediation. Manual gutting on ground floor to protect stucco ceilings.
Result
Gutting completed in 6 weeks. All stucco elements on ground floor successfully preserved.
Project Data
Similar Projects
Commercial GuttingCommercial Gutting Tempelhof
Gutting of a former ground-floor retail space in a mixed-use building in Tempelhof for conversion into modern office space. Removal of all fixtures, suspended ceilings, drywall partitions and the entire shop fit-out down to the bare shell.
Attic GuttingAttic Gutting Pankow
Gutting of an attic in a listed old building in Prenzlauer Berg to prepare for attic conversion.
Office GuttingOffice Building Gutting Charlottenburg
Complete gutting of a 4-storey office building in a central Charlottenburg location for conversion into a modern co-working space. Removal of all non-load-bearing walls, suspended ceilings, raised floors and the entire outdated building services down to the load-bearing shell.
Your Project
Do you have a demolition project?
Contact us for a free consultation and a non-binding fixed-price quote. We will get back to you within 24 hours.