Courtyard Demolition

Courtyard Demolition Kreuzberg

Demolition of a courtyard building via a only 2.5-meter-wide access in Berlin-Kreuzberg.

Courtyard demolition in Berlin-Kreuzberg with a mini excavator via a narrow access, aerial view
01

Challenge

Access only 2.5m wide – no standard excavator fits through. Surrounding buildings directly adjacent.

02

Solution

Use of a mini excavator (1.5 t) with demolition grab. Material transported by conveyor through the access to the container.

03

Result

Demolition successfully completed in 12 working days despite extreme space constraints.

Project Data

Area120 m²
Duration12 Arbeitstage
Equipment
  • Minibagger 1,5t
  • Förderband