Prefab Building Partial Demolition Marzahn
Partial demolition of an 11-story prefab building – demolition of the upper 5 floors with prior hazardous material remediation.

Challenge
The prefab building contained asbestos materials and mineral fiber insulation on several floors. The lower 6 floors were to be preserved and continue in use.
Solution
Floor-by-floor demolition from top to bottom with hazardous material remediation on each floor. Special noise protection measures for the occupied lower floors.
Result
Project completed in 12 weeks without disturbing residents in lower floors. All hazardous materials professionally disposed of.
Project Data
- Longfront-Bagger
- Mobilkran
Similar Projects
School DemolitionSchool Building Demolition Pankow
Demolition of a dilapidated Gründerzeit-era brick school building in Pankow to prepare for a modern new school building.
Industrial DemolitionIndustrial Hall Demolition Spandau
Complete demolition of a former production hall with subsequent site clearing in Berlin-Spandau.
Residential DemolitionSingle-Family Home Demolition Reinickendorf
Complete demolition of a 1960s single-family home with basement and garage in Reinickendorf.
Your Project
Do you have a demolition project?
Contact us for a free consultation and a non-binding fixed-price quote. We will get back to you within 24 hours.